Page 19 - STY İNŞAAT KATALOG TASARIMI
P. 19

KIRŞEHİR-SAVCILI INTERSECTION -SARIYAHŞİ HIGHWAY



                                           It is awarded by the 3th Regional Directorate of the General Directorate of Highways and com-
                                           menced in late of 2011. The project is the unique and differs from other Highways because of
                                           the execution method of road such that; the road has linked to the bridge located at the Hirfanlı
                                           Dam Upstream and the filling of the road has been performed by 180,000meter Geosynthetics
                                                           Piling in order to strengthen bearing capacity of road base.
   14   15   16   17   18   19   20   21   22   23   24